Home             About Us              Consent         Management        Environmental          Acts & Rules          Public Guide              Notices           Downloads                 Waste          Management  
Consent Management
     
bullet   Categorization of Industries
bullet   Consent Under Water & Air Act
bullet   Consent Fee Structure
bullet   Application_Status
      • Consents Status
      • NOC Status
      • Renewal Status
bullet   Delegation of Powers to Grant Consent
bullet   Siting Criteria
bullet   Application Fee
      • Consent to Establish (NOC)     Consent to operate for Red     Category
      • Consent to Establish (NOC)     Consent to operate for     Orange Category
      • Consent to Establish (NOC)     Consent to operate for     Green Category
bullet   Documents Required
      • Consent to Establish (NOC)
      • Clearance Certificate
      • Getting consent to operate     U/s 21 of Air Act, 1981 for     New Industries
      • Getting consent to operate     U/s 21 of Air Act, 1981 for     Existing Industries
      • Getting consent to operate     U/s 25/26 of Water Act,     1974 for New Industries
      • Getting consent to operate     U/s 25/26 of Water Act,     1974 for Existing Industries
     
 
c Consent Management

Application Fee For

  • Consent to Establish (NOC) Consent to operate for Red Category

Sr. No.

Capital Investment

Application fee to be charged for obtaining consent to establish (NOC) / consent to operate for per year (Red Category) Rs.

1.

Upto 5 Lacs

750

2.

5 to 10 Lacs

1000

3.

10 to 25 Lacs

1500

4.

25 to 50 Lacs

2500

5.

50 to 75 Lacs

3750

6.

75 to Less than 1 Crore

5000

7.

1 to 2 Crores

7500

8.

2 to 5 Crores

10000

9.

5 to 10 Crores

15000

10.

10 to 15 Crores

25000

11.

15 to 20 Crores

30000

12

20 to 25 Crores

35000

13

25 to 30 Crores

40000

14

30 to 40 Crores

45000

15

40 to 50 Crores

50000

16

50 to 75 Crores

60000

17

75 to 100 Crores

75000

18

100 to 150 Crores

100000

19

150 to 200 Crores

150000

20

200 to 300 Crores

200000

21

300 to 400 Crores

250000

22

400 to 500 Crores

300000

23

500 to 1000 Crores

400000

24

1000 to 2000 Crores

500000

25

2000 to 5000 Crores

1000000

26

5000 Crores and above

2000000

Note:

  1. Separate consent fee shall be charged for obtaining ‘consent to operate’ as required under the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981
  2. For grant of ‘consent to operate’ as required under Water (Prevention & Control   of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981 more than one year under any category i.e. Red/Orange/Green the consent   fee will charged on yearly basis and for a fraction of the year, the consent fee will be charged for full year.
  3. For extension in the validity of ‘consent to establish’, only 50% of the normal fee applicable for one year will be charged for extension fee for a period of one year or for a fraction of the year.
  4. This order supersedes the earlier orders issued by the Board in this regard from time to time.
  5. This order will be applicable with immediate effects.
     
    No. Admn/SA-2/F.No.563/2009/6 Dated 22.10.9

 

 

 
Home | Events | Awareness | Related Links | FAQ's | Photo Gallery | Contact us | Copyright © 2009. All rights reserved.  
                           
Website designed by: Drish Infotech Ltd.